Tag Archives: RaDAR (Rapid Deployment Amateur Radio)

POTA RaDAR Run Final Activation: Testing the new MTR-3B field kit at Tuttle Educational State Forest

On January 26, 2022, I fit in multiple park activations in one day as a RaDAR (Rapid Deployment Amateur Radio) run. My hope was to activate four or five sites between 14:00 – 21:30 UTC.

Here are the field reports and videos of my first four activations:

The next park in my run (#5) was Tuttle Educational State Forest and it was the final park in this modest RaDAR run!

I packed up the gear at Johns River Game Land in a matter of three minutes, popped it all in the car, then drove 8 minutes to nearby Tuttle Educational State Forest which, at this point, almost feels like a home away from home.

Tuttle Educational State Forest (K-4861)

As I pulled into the Tuttle parking lot, I found my buddy Max (W4GZ) activating the park from his truck. It was no surprise finding Max here since I had just worked him Park-To-Park (P2P) from Johns River next door.

Max delivered some precious cargo: some more of his mom’s homemade QRP pickles!

“Them’s QRP pickles!”

Max continued to activate Tuttle from his truck while I set up my station. Continue reading POTA RaDAR Run Final Activation: Testing the new MTR-3B field kit at Tuttle Educational State Forest

POTA RaDAR Run Activation #4: A “wham bam” activation at Johns River Game Land

On January 26, 2022, I fit in multiple park activations in one day as a RaDAR (Rapid Deployment Amateur Radio) run. My hope was to activate four or five sites between 14:00 – 21:30 UTC.

Here are the field reports and videos of my first three activations:

The next park in my run (#4) was either going to be my last activation, or second to last depending on my available time.

After visiting with my buddy, Hamilton, at his ceramics studio in Morganton (read about that in the previous report) I looked at the time and decided I could fit in a very quick activation of Johns River Game Land (#4) en route to Tuttle Educational State Forest (#5).

I made up my mind en route that I’d use my fastest-to-deploy combo: the Elecraft KX2 and Chameleon CHA MPAS Lite.

I really wanted to be in and out of the site within a 20 minute window. That’s actually very doable as long as I could rack up at least ten contacts in 10-15 minutes. Some days, propagation can make that a tall order, though!

Johns River Game Land (K-6916)

Johns River actually has a number of access points and, frankly, none of them are exactly “bucolic.” Other than the river itself which is beautiful and the main access point for the river which is well-maintained, most of the game land parking areas are filled with litter.

I chose a parking area for this activation which has, in the past, looked like a dumping ground. I was pleased when I pulled into the parking lot this time to find it much cleaner (no old refrigerators or sofas dumped at the far end of the lot) but then again the snow on the ground was likely hiding quite a bit of litter! My philosophy is to always leave a site cleaner than I found it, but Johns River often has so much littler, I could spend a week picking up trash.

After doing a very short intro for my activation video, I set up the Elecraft KX2 and MPAS Lite antenna in a matter of two minutes.

Gear:

On the air

I started calling CQ POTA (with my fingers crossed!) on 40 meters and was very pleased that chasers were out and about!

I worked my ten contact in 9 minutes and then went QRT! Woot!  Here’s the log sheet:

In this short activation, there was actually a P2P with Max (WG4Z) who was just up the road at Tuttle Educational State Forest. We were definitely working each other via ground wave.

The contacts were flowing so well, that I wanted to stay on the air a bit longer, but I knew to fit in Tuttle and a hike, I really needed keep moving. As soon as I worked my ten, I hopped off the radio.

While I like putting more contacts in the log–especially when they’re flowing so freely–it was actually kind of fun to validate this activation in somewhat of a “sprint.”

QSO Map

Here’s what 5 watts and the MPAS Lite yielded in nine minutes on the air:

Activation video

Here’s my real-time, real-life video of the entire activation. This must be one of the shortest activation videos I’ve ever made:

Click here to view on YouTube.

Thank you

Thank you so much for reading this short report and coming along with me on this RaDAR run! I’ll be posting Park #5–Tuttle Educational State Forest–soon where I catch up with Max (WG4Z) and we work park-to-park once again.

As always, I’d like to send a special thanks to those of you who have been supporting the site and channel through Patreon and the Coffee Fund. While certainly not a requirement as my content will always be free, I truly appreciate the support.

These are crazy times we’re living in these days (at time of posting). I wish all of you good health, safety, and peace–especially our good friends in Ukraine.

Let’s all treat each other with kindness and respect this week as we remember that all we’ve got on this old planet is each other.

I hope you get some time to play radio this week!

72,

Thomas (K4SWL)

POTA RaDAR Run Activation #3: Table Rock Fish Hatchery

On January 26, 2022, I decided to fit in multiple park activations in one day as a RaDAR (Rapid Deployment Amateur Radio) run. My hope was to activate four or five sites between 14:00 – 21:30 UTC.

Here are the field reports and videos of my first two activations from this run:

The next park in my run (#3) was Table Rock Fish Hatchery, a good 40 minute drive from the spot where I operated at activation #2.

The drive to Table Rock was most pleasant and I stopped a couple times to take in views along the forest service road leading down the mountain.

I was pointing my finger and saying, “I’m going to activate your summit soon, Table Rock!”

I mentioned in a previous post that I made this RaDAR run unnecessarily more complicated by deploying a different antenna and radio combo at each site.

On the drive to the fish hatchery, I decided to use the PackTenna 9:1 UNUN random wire antenna and pair it with my Yaesu FT-817ND.

It had been a while since I used the FT-817ND in the field, so I was very much looking forward to putting it on the air! Continue reading POTA RaDAR Run Activation #3: Table Rock Fish Hatchery

POTA RaDAR Run Activation #2: Pisgah National Forest & Pisgah Game Land

As mentioned in my last field report, on January 26, 2022, I decided to fit in multiple park activations in one day as a RaDAR (Rapid Deployment Amateur Radio) run. My hope was to activate four or five sites between 14:00 – 21:30 UTC.

The first activation at Lake James State Park went so well, it started me out a little ahead of schedule.

After packing up my gear at Lake James, I began a 40 minute drive to the second site–Dogback Mountain–where I hoped to do a POTA two-fer along with a Summits On The Air activation.

The drive was beautiful. Only twenty minutes into the trip, I came to the forest service road that lead to Dogback Mountain. For a six mile drive, Google Maps was telling me it would take about 20 minutes, so I knew the dirt road would require slow driving.

The road was actually in pretty good shape, but there are rocky and rough spots that pretty much require good vehicle ground clearance. My Subaru had no issues at all–in fact, I love driving on back roads like this!

Three or four miles into the forest service road I reached an impasse.

While there hadn’t been snow in the area for at least a week, the north slope portions of the road were quite icy. The thaw and night time freezing pretty much meant that there was no snow to navigate–only ice, and I’m not a big fan of ice.

I already passed through two sections of ice where I could still manage a little traction on the side of the road (at least half the car had traction). At one point, though, I saw a large section of icy road ahead, so I parked the car to investigate what it looked like over the crest of the hill.

It was so icy, I struggled to find a spot to walk on to peek over the hill and almost slipped once. That hill was pretty steep and I could see no spots for the car to get traction. Remembering what my wife said that morning (“Don’t do anything crazy, okay?“) and knowing that the worst thing for my RaDAR run would be getting stuck in a spot recovery vehicles might struggle with, I chose the option of forgoing the summit activation.

Frankly, if the summit activation was the only thing on the schedule that day, I would have likely parked, then hiked 3 miles to the summit along the forest service road. But my RaDAR run left no time for this.

Fortunately, where I parked was firmly in the two-fer zone of Pisgah National Forest and Pisgah Game Land!

Pisgah National Forest (K-4510) and Pisgah Game Land (K-6937)

I parked the car on one of the many roadside camping areas right there on the ridge line. It was an ideal spot for a field activation: good altitude, no obstructions, and lots of trees. Continue reading POTA RaDAR Run Activation #2: Pisgah National Forest & Pisgah Game Land

POTA RaDAR Run: Planning, Plotting, Packing, and Activating Park #1!

You may have noticed a common theme in my field reports: basically, it’s rare that I plan out an activation more than 24 hours in advance.

Indeed, due to my “dynamic” (I think that’s a good word for it?) family schedule, I often don’t plan an activation more than one to two hours in advance.

But last month, I saw an opportunity open on Wednesday, January 26, 2022. Basically, I had from early morning until late afternoon to play radio.

Making plans

At first, I thought about striking out early and hitting some of the parks that are a little further afield–parks I hadn’t visited in a couple years, or some new-to-me parks.

Then, I hatched an idea to activate two SOTA summits. Both would qualify for bonus winter points and both were technically doable in the time I had allotted. It would involve about 9-10 miles of hiking in addition to 3 hours of driving plus allotting for the time I’d actually spend on the air. It would equate to a very early departure and some steady hiking.

That Tuesday evening, I started putting the plan together, downloading all of the maps, preparing my SOTA alerts, and packing my SOTA pack. I spent the better part of an hour plotting and planning these activations.

Then the realization hit me: the trails I’d be hiking were likely covered in snow and ice which would slow me down considerably especially since my Yaktrax Traction Chains hadn’t yet been delivered. I realized the schedule was just a little too tight. There’s be no room for mishaps and if I made the trip I really wanted to hit both summits in the same day. So, I saved all of my maps, links, and notes to do this multiple SOTA run in the near future.

Back to the drawing board!

I decided that I did like the idea of doing multiple activations in a day, so why not fit in a RaDAR run?

RaDAR (Rapid Deployment Amateur Radio) is basically an activity that can be combined with summits and/or park activations and the idea is simple: you complete multiple rapid field deployments within 24 hours.

If you’d like more information about RaDAR, check out this webpage. Parks On The Air even has a few awards for RaDAR runs–it would be fun to apply for one of them (thanks, WD8RIF, for the heads-up!).

I so rarely have enough time to consider more than two or three activations in a day that the idea of fitting in four or possibly five activations was very appealing.

I looked at the POTA map and sorted out a route between park entities that were all in western North Carolina. I was familiar with all of the locations save one which had the potential to be both a POTA and SOTA activation. Continue reading POTA RaDAR Run: Planning, Plotting, Packing, and Activating Park #1!